Commercial trucks with air brakes will also continue to be prohibited traveling westbound over Mt. Rose Highway between the Mt. Rose ski resort and Incline Village from 8:00 p.m. Sundays through noon on Fridays. The truck closure is a safety precaution to prevent trucks traveling down the mountain potentially encountering brake issues in the road work zone. Trucks will be allowed to travel eastbound from Incline Village to Reno.
Through the coming three construction seasons, drivers will see continuing shoulder and single lane closures on Mt. Rose Highway from the summit to Incline Village and State Route 28 from Crystal Bay to near Sand Harbor State Park as NDOT repaves and improves nearly 15 miles of highway.
Drivers can visit inclinehighways.com, dial (775) 560-0402, or e-mail inclinehighways@gmail.com for project information. Drivers can also sign up for project e-mails on the website or by texting INCLINE to (775) 242-9168.
State Route 28 from Nevada/California border to Ponderosa Ranch Road in southern Incline Village
– Repaving- Four inches of roadway asphalt will be removed and replaced.
– Select roadway cross slopes will be reconstructed for enhanced roadway alignment and drainage.
– Drainage and guardrail improvements will enhance roadside safety and water quality, ensuring additional stormwater treatment before reaching Lake Tahoe.
– Enhanced sidewalks, sidewalk ramps and driveway accesses
– An aging timber retaining wall on State Route 28 approximately a half-mile south of Memorial Point lookout will be reinforced with a soil nail wall.
Drainage improvements will be made where Marlette Creek crosses underneath SR 28, enhancing water quality and ensuring additional stormwater treatment before reaching Lake Tahoe.
State Route 431 (Mt. Rose Highway) from State Route 28 roundabout in Incline Village to Tahoe Rim Trailhead at Mt. Rose Summit
– Repaving- Three inches of roadway asphalt will be removed and replaced.
– New concrete barrier rail
– Select roadway shoulders will be reconstructed and flattened.
As many as 10,000 drivers travel the stretch of highway every day. The highways were last fully reconstructed nearly 14 years ago.
Content retrieved from: http://southtahoenow.com/story/05/14/2021/lane-closures-mt-rose-highway-start-monday-multi-year-road-project-begins.