PLACERVILLE, CALIF – El Dorado County Department of Transportation, Maintenance and Operations’ contractor, American Pavement Systems, will perform asphalt resurfacing work at various locations throughout the Placerville, Cameron Park and El Dorado Hills. Areas including, but not limited to, Teal Pond and streets off of Cambridge Oaks Subdivision and Crescent Hills/ Ridge Subdivision will be impacted.
The work will begin May 6th, 2021 and continue through June 1st, 2021 from 7:00 am to 7:00 pm. Project dates are estimated based on favorable weather conditions. Traffic control will be in effect for the duration of the project. Slower speeds and caution is highly recommended.
Cooperation and patience during these projects is appreciated. Please watch for Door Hangers, Pamphlets and Barricades with information regarding, Project Times/Duration, Scheduling and No Parking. Questions regarding maintenance activities may be directed to the Department of Transportation, Maintenance and Operations Division at (530) 642-4909.